High-pressure gas pipelines under construction (PSG)

High pressure gas pipelines that PSG is building under its 2021-2027 programme, with the completion date PSG gives. A new pipeline can raise the network's absorption nearby, so a plot that is far from the network today may have a closer connection in a few years. The dates are PSG's plan, not the date the pipeline goes into service.
Data source: Polska Spółka Gazownictwa (absorption map)
Other layers in this category
- Utility networks (BDOT10k)
- Substations (OSM + BDOT10k)
- HV/EHV power lines (OSM)
- Power lines (BDOT10k)
- Transformers & power plants (BDOT10k)
- Grid connection capacity (DSOs & PSE)
- Gas pipelines (PSG, GAZ-SYSTEM)
- Gas grid hourly absorption – biomethane (PSG)
- Gas grid daily absorption – biomethane (PSG)
- Biomethane connections (PSG)
- PSG gas district areas
- DSO service areas