Planned renewable projects (EIA decisions, permits)

Planned solar and wind farms, battery storage, biogas plants and small hydro, before they are built. The layer joins the applications and decisions on environmental conditions (DŚU) from the Ministry of Climate’s Ekoportal archive and the notices of the regional environmental directorates (RDOŚ) with building permits from the GUNB register, and shows the documents of one procedure as one project. The colour gives the stage: building permit, environmental decision issued, procedure under way, decision older than 6 years with no permit, or proceedings discontinued or refused. The location comes from the parcel numbers in the document; where there are none, the project covers its whole cadastral precinct or is a point in the municipality. The Ekoportal archive ends in July 2025 and not every office used it. Proceedings run by the RDOŚ, mostly for wind farms, continue from their notices on the BIP, but municipal decisions, including those for most solar farms, after June 2025 have to be checked on the municipality’s BIP. A project missing from the map therefore does not mean nothing is planned nearby.
Data source: Ministry of Climate (Ekoportal), RDOŚ and GUNB
Other layers in this category
- Wind turbines (OSM)
- 700 m from wind turbines
- Solar irradiance (PVGIS)
- Solar PV plants (OSM)
- Hydropower plants (OSM)
- Biomass (OSM)
- Nuclear power plants (OSM)
- Areas excluded from OPRO (RDOŚ sensitivity maps)
- Weather stations (IMGW-PIB)
- Biogas plants (KOWR + URE)
- Wastewater treatment plants (KPOŚK)
- Dairies and meat plants (GIW)
- District heating companies – seats (URE)